CASE STUDY
Concrete cutting on railway drains
Client’s Brief
Remove concrete from a 150mm plastic pipe, 100m from nearest access point and positioned under a newly laid railway track and brand-new refueling depot.
Solution
Employ specialist concrete cutting head to carefully remove the set concrete and debris from pipework without damaging the pipe.
Site Difficulties
To remove concrete from a delicate, plastic surface water pipe and its close proximity to the railway tracks and refueling depot, access was restricted also.
For more information please contact us directly.
Contact Us
For further information on blocked drains, CCTV drain surveys, drain lining, drainage repairs and groundworks, sewer rehabilitation, new sewer connections or any other of our drainage services, just get in touch.
0845 1949200 or 024 7639 0850
Unit 12a, Four Ways,
Carlyon Industrial Estate
Atherstone
CV9 1LG