Client’s Brief

Remove a steel foundation pile which had be accidentally driven through a 6 meter deep sewer under a Tesco Superstore.

Solution

Use a 40,000psi abrasive cutting  unit to cut through the steel pile, remove the large lump of concrete and steel once cut, then install a specialist patch repair to support the pile and seal the pipe work.

Site Difficulties

Depth of the sewer, under a new Tesco’s Superstore, which was 6 meters deep, next to a large retaining wall and large water course and the access manhole was in a busy four way  junction.

For more information please contact us directly.

IMAGE GALLERY | Steel Cutting In Sewers

Contact Us

For further information on blocked drains, CCTV drain surveys, drain lining, drainage repairs and groundworks, sewer rehabilitation, new sewer connections or any other of our drainage services, just get in touch.

0845 1949200 or 024 7639 0850

Unit 12a, Four Ways,
Carlyon Industrial Estate
Atherstone
CV9 1LG